Kawasaki Gas turbine generator Japan
ID: 69383
Kawasaki Gas turbine generator
L30A 34mw 60hz 2020 in Japan
DESCRIPTION:
Reportedly very little used 34000 kW Kawasaki Gas Turbine Power Plant. Manufacturer: Kawasaki (Japan) Manufacturing year: August, 2020 Type: Co-Generation
Still in operation, new in 2020, commercial operation starts in 08/2021, to be shut down at 03/2024. Operating hours 13,298 hours was at 16:00 on May 25, 2023. Expecting total operation hours to 03, 2024 to be around 20,000 hours. There is a steam generator (boiler) that produces steam using exhaust gas. Steam product: 31.2 tph at 7 MPaG, 9 tph at 1.6MPaG, last maintenance was in March, 2023, number of start-up: 66 times.
a. Gas Turbine Manufacturer: Kawasaki (Japan) Manufacturing year: August 2020 Condition: little used Model: L30A Fuel: Gas Electric Output(kWe): 34MW Type: Simple open cycle, Two-shaft Compressor: Axial flow 14-stage Combustor: 8-can RPM: 5576 Pressure ratio 24.5 Exhaust gas temperature: 502 °C Heat rate: 8930(Kj/kW-hr) Exhaust gas mass flow: 333.3(x 1000kg/h) LHV of Fuel: 35.9(MJ/Nm3) Thermal efficiency: 41.2% Heat recovery efficiency: 46.1% Total LHV thermal efficiency: 85.5% Overhaul intervals: 6 years Required space for Turbine system +Alternator system: approx. 11m x 25m x11m (Maximum height of air inlet) Eco-friendly low NOx emissions: NOx reduction method: DLE (Dry Low Emission), NOx: 15 ppm(15%=O2), Operating range of DLE (Dry Low Emission): 70~100%
b. Alternator Manufacturer: Meiden (Japan) Manufacturing year: 2020 Condition: A little used Type: Synchronous Rated power: 37,945kVA Rated current: 1992A RPM: 1800 Voltage: 11,000 V Frequency: 60 Hz Phase: 3 Poles: 4 Power factor: 0.90 Field Voltage: 128V Field Current: 598A Weight: 83 ton Required cooling water: 160m3/h Lubricant: 110L/min Weight: approx.84ton
c. Steam Absorption Chiller Manufacturer: FCO Kawasaki (Japan)
Manufacturing year: August, 2020 Cooling capacity: 2462kW Cold water flow rate: 423.4m3/h Outlet temperature: 7°C Cooling water flow rate: 700m3/h Inlet temperature: 32°C Maximum steam consumption: 2695kg/h Steam inlet pressure: 0.785MPa (Gauge) Power: 440V, 60HZ
Frequently asked questions;
Kawasaki gas turbine generator L30A 34mw 60hz 2020 in Japan
It is dual fuel gas and liquid fuel.
Exact current operating hours and starts
Operations hours 19596 hours for gas , 439 hours for liquid fuel.
Serial number
We can ifm after we offer this plant firmly
Current ownership and selling mandate
Current ownership is Japanese factory in Japan and seller is Japanese big Co who is representative of sales from owner and has professional dismantle work and have experience of relocation of those power plants and industrial plants to many countries.
Complete maintenance and preservation history
Complete maintenance and preservation history can inspect at time of your inspection.
Exact scope of supply
Whether HRSG, generator and auxiliaries are included
Scope of supply, HRSG cannot include scope of supply due to not possible to dismantle the big boiler properly for reset up and transportation problem.
Other equipment Gas turbine engine, gear box, alternator, control unit, dubu Oil system, gas compressor and other auxiliaries are included.
Inspection possibility in Japan
Inspection can be done after buyer sends LOI and POF with escrow deposit 5%
Kawasaki OEM support for recommissioning
Maker does not help for recommissioning for used power plants but seller can support for recommissioning.
Earliest delivery
Delivery can ifm you after owner cfm to sell firmly.
Price can ifm only after owner cfm to sell it firmly and can ifm the result around mid September 2026.
FYI we have other offer for Mitsubishi gas turbine generator H25 32mw x 2 units 60Hz 13800v 2 units package deal,hour meter abt. 21000 hours for both. Stock in Japan.
Stop operation on 2023 (start operation 2014)
Already started DISMANTAL from 1st of Aug. Finish dismantle end of Sept. 2026, delivery after end of Sept.
Price of two units package at Usd8.75 million fob Kobe. Subject prior sales.
If you are interested in this offer, we can send you details as seller is same for Kawasaki Gas turbine generator and they can help for commissioning.
Price on request
Contact Us
If you are interested in buying this stock offer or you have any questions feel free to contact us.